Monitoring for tunnels

The complete solution for monitoring in a tunnel environment

 
 

The constantly evolving developments in towns and cities can congest areas leaving no space for future development or for the existing infrastructure and utilities to function. The solution in many urban areas is subterranean expansion such as tunnelling projects, creating space above and moving infrastructure below. However, these spaces are often hazardous environments, failure to monitor any affected areas or assets would endanger construction workers and any effected assets within the zone of influence of the tunnel.

Deformation monitoring provides real-time information about ground movements and tunnel distortions (e.g. displacement, ovalisation, convergence), allowing rapid and critical decisions to ensure the highest safety and effective risk management.

Total monitoring is the combination of data from geodetic monitoring sensors (total stations, GNSS, levelling or InSAR) with geotechnical and environmental sensors (tilt sensors, strain gauges, weather stations, etc.) and interferometric radar. It provides the complete picture about events occurring helping a greater understanding of the influence from construction or related activities. This is particularly critical when the tunnel excavation intersects with another tunnel structure, railway line, pipeline or passes beneath a heritage structure.


Why monitoring is beneficial in tunnels:

  1. To record ground deformation before, during and after tunnel construction: excavation of the ground for a tunnel creates a low-pressure area which the surrounding material will attempt to move into to equalise. Therefore, a tunnel needs to support this to maintain its void.
    Engineers can be informed about the normal movements of the ground, deformation during construction and longer term once the structure is completed. This allows engineers to balance changes in pressure, which may put a critical amount of strain and tension on the tunnel structure, preventing distortions or even collapse.
  2. To protect adjacent assets: any excavation or construction that takes place near existing assets may cause movements that damage them, being aware of the first signs of movement via monitoring data allow for preventative/corrective actions. This is particularly critical when the tunnel excavation intersects with another tunnel structure, railway line, pipeline or passes beneath a heritage structure.
  3. To detect changes in shape and structure during tunnel renovation: modernisation processes within the tunnel such as replacement or re-lining may introduce increased stress on the tunnel structure, causing movements or distortions. At this time it is critical to understand the effects of the works on the tunnel shape and structure.
  4. To provide structural health monitoring: during the lifecycle of the structure from construction, assessing its performance and degradation over time, potentially extending the lifespan of structures or providing information for change in future designs.
  5. To document historical change: Structural records associated with the deformation caused by tunnel construction or modification in case a disaster occurs.
  6. To assess the impact of environmental change: upon the construction site and the inverse influence of the construction on the local environment.


This video presents typical generic examples of monitoring installations
in a tunnel, yet every monitoring project requires its own specifically assessed and designed monitoring system thus specialists should be consulted before any installation. 




사례 연구

Underneath King’s Cross redevelopment

Ensuring safety in London’s underground with a tailored monitoring solution
Ensuring safety in London’s underground with a tailored monitoring solution

Monitoring Australia's Biggest Transport Project

As excavation and construction barrel ahead on the Sydney Metro, a small and vital team of engineers have been quietly navigating the crowds and rumbling trains that define Sydney’s Central Station.
As excavation and construction barrel ahead on the Sydney Metro, a small and vital team of engineers have been quietly navigating the crowds and rumbling trains that define...

Monitoring Along the Construction Site of the Warsaw Metro Line 2

3D deformation monitoring of an urban area along the construction site of the Warsaw Metro Line.
3D deformation monitoring of an urban area along the construction site of the Warsaw Metro Line.
소프트웨어 제품

라이카 GeoMoS

유연한 자동 변형 모니터링 소프트웨어 솔루션
유연한 자동 변형 모니터링 소프트웨어 솔루션

라이카 GeoMoS Edge

자율 센서 제어 및 현장 내 중단 없는 데이터 로깅을 위한 모니터링 소프트웨어
자율 센서 제어 및 현장 내 중단 없는 데이터 로깅을 위한 모니터링 소프트웨어

Leica GeoMoS Now!

Analyse & visualise monitoring data from everywhere.
Analyse & visualise monitoring data from everywhere.
하드웨어 제품

라이카 Nova TM60 모니터링 토탈스테이션 – 모니터하세요.

견고하고 정밀하며 내구성이 뛰어난 라이카 Nova TM60 로봇 토탈스테이션은 데이터를 안전하고 지속적으로 수집해야 하는 프로젝트를 모니터링하는 데 도움이 됩니다. 항상 신뢰할 수 있는 실시간 정보 및 보고서를 제공하고 정확한 정보를 바탕으로 적시에 의사 결정을 내릴 수 있도록 지원합니다.
견고하고 정밀하며 내구성이 뛰어난 라이카 Nova TM60 로봇 토탈스테이션은 데이터를 안전하고 지속적으로 수집해야 하는 프로젝트를 모니터링하는 데 도움이 됩니다. 항상 신뢰할 수 있는 실시간 정보 및 보고서를 제공하고 정확한 정보를 바탕으로 적시에 의사 결정을 내릴 수 있도록 지원합니다.

Leica ComBox60

An intelligent autonomous device for communication and power management.
An intelligent autonomous device for communication and power management.

Geotechnical Sensors

Automated geotechnical sensor measurement & data acquisition
Automated geotechnical sensor measurement & data acquisition


Got questions? We´ve got the answers!

Let us support you